  • BMK Silbitz, Germany

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2002

    Contract included: Delivery and installation of complete steam boiler house, biomass-fired (wood waste).

    Boiler technical specifications:

    • boiler efficiency: 28 t/h
    • live steam pressure: 46 bar
    • superheated steam temperature: 425° C

    Besides:

    • Delivery and installation of: Steel construction of boiler house, exchange station,turbine house (360 t), flues and piping,
    • Assembly of: Bag filter (468 bags O88), fuel feeder, turbine, steamcondenser and adjacent systems, all air, steam and watersystems, thermal insulation.
  • Rotterdam, Holland

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2002

    Contract included: Prefabrication, delivery and installation of complete directly fired boiler (DFB).

    Boiler technical specifications:

    • boiler efficiency: 220 t/h
    • live steam pressure: 73 bar
    • superheated steam temperature: 440° C

    Prefabrication, delivery and installation of boilers piping:
    DFB - external pipelines
    (HRSG) waste-heat boiler with following parameters:

    • boiler efficiency: 220 t/h
    • live steam pressure: 73 bar
    • superheated steam temperature: 440° C
    • Internal and external pipelines

    Assembly of: 4 burners piping (DFB) and 18 nozzles (HRSG).

  • Unilin, Bazeiles, France

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2002

    Contract included: Prefabrication, delivery and installation of complete equipment hot gas generator and oil heating boiler for technological purposes including grate, ducts, pipelines. Participation in start up, tests and assembly
    of the construction.

  • Winnica, Ucraine

    Customer: Podillja - Obst
    Implementation year: 2002

    Contract included: Delivery and installation of complete steam boiler house "turnkey"including electrical part, Control and Measurement Instruments and Automation with full visualization of technological processes (2 steam boilers, 12 t/h each).

  • BMK Baruth, Germany

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2002

    Contract included: Manufacture and assembly of pulverized fuel boiler.

    Boiler technical specifications:

    • boiler efficiency: 34 t/h
    • live steam pressure: 95 bar
    • superheated steam temperature: 480° C

    Manufacture and delivery of grate boilers with the following parameters:

    • boiler efficiency: 2x46 t/h
    • live steam pressure: 95 bar
    • superheated steam temperature: 450° C

    Delivery and installation of: All adjacent installations, air and flue gas ducts
    including filters and cyclones.

  • InfraServ Bayernwerk Gendorf GmbH, Burgkirchen, Germany

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2002

    Contract included: Delivery and installation of waste-heat boiler

    Boiler technical specifications:

    • boiler capacity:130 t/h (29 hanging modules)
    • including adjacent pipelines,
    • live steam pressure: 71 bar
    • superheated steam temperature: 510° C

    Delivery and assembly of : Flues 124,4t. Assembly of emergency chimney.

  • Punka Voima, Finland

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2001-2002

    Contract included: Manufacture and assembly of grate boiler.

    Boiler technical specifications:

    • boiler efficiency: 50 t/h
    • live steam pressure: 54 bar
    • superheated steam temperature: 246° C

    Delivery and installation of: Belonging pipelines and piping, flues, economizer,
    boiler drum, evaporator, slag trap, thermal insulation.

  • Oleicola El Tejar für BMK Baena, Spain

    Customer: Standard Fasel Lentjes B.V.
    Implementation years: 2001-2002

    Contract included: Manufacture and assembly of the boiler with travelling grate including all the belonging pipelines,
    air and exhaust ducts.

    Fuel: Waste from olive oil production.

    Boiler technical parameters:

    • boiler efficiency: 110 t/h
    • live steam pressure: 64 bar
    • superheated steam temperature: 455° C

    Delivery and installation of: 2 wet slag traps.

  • Glunz, Nettgau Span, Germany

    Customer: Standard Fasel Lentjes B.V.
    Implementation year: 2001

    Contract included: Delivery and installation of complete system of hot gas generation of temperature: 820o C, consisting of 2 generators with power of 62 MW and 43 MW. Design, delivery and installation of complete construction of service platforms (160 t).

  • Saargerg Fernwärnne Hamburg, Germany

    Customer: Mehldau & Steinfath Feuerungstechnik GmbH
    Implementation year: 2001

    Contract included: Reconstruction of the heating boiler from solid to gas fuel. Delivery of 4 gas burners with capacity of 6,8 MW.